Hvac School - For Techs, By Techs

Planning and Layout of HVAC Projects

Informações:

Synopsis

In today’s podcast, Eric Mele and Bryan explain the planning, layout, and execution of HVAC projects. They mostly cover commercial ductwork but also touch on piping and some residential projects.   Planning   The first step is to review the construction plan WITH a site visit. It is best to see how a plan works within the space; plans may be feasible on paper but may not work out as planned in the actual space.    During the site visit, you also want to establish solid communication with everyone else on the project. As such, it is best practice to have a coordination meeting with the general contractor and other trades (such as drywallers) to communicate potential areas of conflict. (When building ducts in commercial structures, you will want to watch out for conflicts with trusses, joists, fire sprinklers, and plumbing/drains. In residential structures, you will have to watch out for ventilation paths, such as dryer vents and kitchen exhaust vents.)    Before deciding to alter the design, be sure to communi