Get It Right With Undercover Architect
How to Manage Project Costs Without the PAC Process
- Author: Vários
- Narrator: Vários
- Publisher: Podcast
- Duration: 0:33:37
- More information
Informações:
Synopsis
Hello! This is Episode 362, and in it, I’m sharing what to do if you’re not using the PAC Process - or Paid As Consultant Process - but still want to ensure you don’t get massively disappointed when your project gets priced before you start construction. Perhaps you still want to competitively tender your project? Or you’ve found out about the PAC Process too far into your project? Or your architect or designer isn’t interested in doing it at all, or has another method they’re suggesting to you? This is something I get asked about a lot. So, in this episode, I want to give you clear guidance on what you can do instead. [For all resources mentioned in this podcast and a free, downloadable PDF transcript, head to www.undercoverarchitect.com/362.] Because if you can’t, or don’t want to, use the PAC Process, there are still really practical ways to reduce your risk, get accurate cost feedback, and avoid the heartbreak of working for months, and spending a lot of mon