Future Hindsight

A Renewable Future: Mark Z. Jacobson

Informações:

Synopsis

Nuclear Power is Impractical Building nuclear power plants is extremely costly and time-consuming; projects are often plagued by cost overruns and construction delays. Between permitting, planning, and construction, it takes 10-19 years for a plant to become operational. To meet our climate goals, we need to transition 80% of our energy to carbon-free solutions by 2030. From a logistical standpoint, nuclear cannot become our carbon-free energy source because it will arrive too late. In addition, aging nuclear power plants become more expensive to maintain and operate, which necessitate additional subsidies. Maintenance requirements shut down the whole plant and energy production goes to zero during that time. Nuclear Technology Risks In addition to the practical barriers of building a nuclear grid, nuclear technology has inherent risks. Some of the radioactive nuclear waste takes hundreds of thousands of years to decay, posing long term problems for safe maintenance. The technology can and has been used for w